March 21st trailwork session was a success with 13 people showing up. 
The entire system was walked raking when necessary plus removing downed limbs and trimming back branches. 
The narrow ravine on the outer loop in the back was replaced with a bench-cut trail and rerouting on the upper section.
Due to flooding the culvert installed in 08 required some reconstruction.
All in all the trail is in exceptional condition due to a dryer than normal spring.